Upcoming IASI updates

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #12940
    Nigel AtkinsonNigel Atkinson
    Moderator

    The following activities are planned:

    1) A TOP upload for IASI on Metop-B is foreseen on the on the 8th of August to update the coding table for the Moon calibration exercise. Auxiliary Files will be delivered by mid July. There will be no impact on the level 1c radiances.

    2) The new correction of non-linearity for IASI on Metop-A will be uploaded on the 30th of September. Auxiliary Files will be delivered by the end of July. The impact on the level 1c radiances will be around 0.1-0.2K depending on the scene temperature.

    #12962
    Nigel AtkinsonNigel Atkinson
    Moderator

    As mentioned above, the BRD file for 8th August is now available on the ftp site: ftp://ftp.eumetsat.int/pub/NWPSAF/aapp_data_files/OPS-LRS/aux_data/

    IASI_BRD_xx_M01_20190706000000Z_xxxxxxxxxxxxxxZ_20190705085422Z_IAST_0000000015

Viewing 2 posts - 1 through 2 (of 2 total)